We're the ERP team that knows your floor by smell.
Trustbit was started by two people — a software system designer and a business owner — who'd watched too many SAP, Busy Accounting and Tally deployments crash into reality. We build a single configurable ERP, but we implement it the slow, careful way: by walking your floor, reading your registers and listening to your shift in-charge.
Three rules we'd rather not break.
They sound obvious. Most ERPs we replace have forgotten one or more. We treat them as non-negotiable, even when it means walking away from a deal.
Floor first, slide deck last.
Every implementation starts with two engineers on your shop floor for two full days. No proposal goes out until we've watched a shift change.
Configurable, never custom-forked.
One codebase, one upgrade path. Industry-specific logic lives in configuration — not in a snowflake branch only one engineer remembers.
The team that builds it, runs it.
Your implementation engineer is your AMC engineer for the first two years. No "knowledge-transfer" PowerPoint between us and your support contract.
Twelve years on the floor.
We grew where India's specialty manufacturing grew. From a one-distillery deployment in Baramati to 62 plants across five industries — every milestone is a customer that stayed.
| Year | Milestone | What changed | Floors live |
|---|---|---|---|
| 2014 | Founded · Bangalore | A software system designer and a business owner walk away from a failed ERP rollout and start writing the ERP they wished they'd had — built for India's specialty manufacturing floors. | 1 |
| 2016 | Ethanol Suite v1 | First excise-aware, bonded-warehouse ERP for a 60 KLPD distillery in Baramati. Closes month-end in 3 days for the first time in plant history. | 4 |
| 2018 | Frozen Foods Suite | FEFO + cold-chain temperature audit shipped after a year embedded with a Navi Mumbai IQF plant. | 12 |
| 2020 | Trustbit Core v3 | Single configurable engine replaces four industry-forks. Same codebase, different configs — no more snowflake branches. | 24 |
| 2022 | Polymer + Furniture suites | OEE-driven shop-floor terminals (Polymer) and made-to-order variant BoM (Furniture) ship in the same release. | 41 |
| 2024 | Plant Insights beta | SCADA / OPC-UA bridge: live OEE, yield and energy on a boardroom-ready dashboard by 9 a.m. every day. | 56 |
| 2026 | v4.2 · here | Today: 62 live floors, 96% client retention, three regional support hubs (Bangalore · Betul · Hyderabad · upcoming), and a queue. | 62 |
The people who'll actually show up.
Trustbit has no "delivery hierarchy." The engineer who scopes your project is the one who'll be on your floor at go-live, and on WhatsApp at 11 p.m. when the OMC tanker has a discrepancy.
Hire the team — not just the product.
We don't bid against a hundred integrators. If we take on your floor, it's because we want to live with you for the next five years. Talk to us and let's see if we fit.

