Trustbit Technologies
All systems on-shift Book a walkthrough
02 · Industries

Five floors we know by heart.

We don't sell a horizontal ERP and call it "configurable." Each Trustbit suite ships with the master data, GMP / GST workflows and reports specific to your floor — so go-live is in weeks, not "phase two".

01spirit / ENA

Ethanol & Distilleries

Molasses-in to ENA / Bio-ethanol-out, with excise, bonded warehouse and OMC despatch tracking baked in.

Excise Batch OMC despatch CO₂ recovery
02cold chain

Frozen Food

IQF lines, blast-freezer slots and cold-store inventory with FEFO picking and temperature-log audit trails.

FEFO Cold-store FSSAI Export docs
03RTE / RTC

Ready-to-Eat

Recipe versioning, retort-batch genealogy and SKU-level cost roll-ups for kitchen-to-shelf operations.

Recipe BoM Retort log Shelf-life QC
04process

Polymer Products

Injection / extrusion shift-tracking, scrap re-feed accounting and tool-life management on a real OEE view.

OEE Tool-life Re-feed Mould BOM
05discrete

Furniture & Wood

Made-to-order BOM with finish & hardware variants, cutting-list optimization and showroom-to-shop-floor handoff.

Variant BoM Cutting list MTO Showroom
03 · Modules

One platform, twelve modules, your process.

Every Trustbit deployment is the same engine — finance, plant, supply, people — wired differently for your industry. Pick what you need now, switch on the rest as you grow.

Procure-to-Pay

m_01

Indents, vendor RFQs, GRN, three-way match. Excise + GST + TDS in one ledger pass.

STABLE · v4.2

Plan & Schedule

m_02

MPS, finite-capacity scheduling and tool / mould / retort slot booking from a single Gantt.

STABLE · v4.2

Production & Batch

m_03

Shop-floor terminals, batch genealogy, in-line QC, yield & loss tracking by shift.

STABLE · v4.2

Warehouse & FEFO

m_04

Bin-level inventory, cold-store slots, lot tracing and expiry-aware picking — barcode & RFID.

STABLE · v4.2

Quality & Compliance

m_05

FSSAI / GMP / ISO templates, CoA generation, lab integration, deviation & CAPA workflow.

STABLE · v4.2

Sales & Despatch

m_06

Quote-to-cash, e-invoice, e-way bill, OMC tanker despatch and exports with shipping bills.

STABLE · v4.2

Finance & Excise

m_07

Indian GAAP / Ind AS, bonded warehouse, RG-1, MIS that closes a month in three working days.

STABLE · v4.2

People & Payroll

m_08

Shift rosters, biometric attendance, contractor labour, PF / ESI, full-and-final.

STABLE · v4.2

Plant Insights

m_09

OEE, yield, energy & CO₂ telemetry pulled from PLC / SCADA — boardroom-ready by 9 a.m.

BETA · v5.0
04 · How we work

Six to twelve weeks. Then we stay.

Implementation isn't a project we hand off — it's a relationship that starts at site survey and continues through the AMC. Same engineers from kick-off to year five.

/ 01

Floor walk

Two engineers, two days on your floor. We map your real process — registers, registers behind registers, the spreadsheet your supervisor swears by.

Week 0 — on-site
/ 02

Configure

We pick the industry suite, set master data, wire approval matrix, hardware list and the integrations you need from day one.

Week 1–4 — Bangalore lab
/ 03

Pilot & train

Soft go-live on one line / one warehouse. Train-the-trainer with role-based videos in the language of your floor.

Week 5–8 — your site
/ 04

Go-live & AMC

Hard cutover with engineers on-site for the first close. Then a named SLA team — phone, WhatsApp, on-call.

Week 9+ — forever
// 05 · what your floor already speaks
// equipment & protocols · bridge built-in
Siemens PLCSIMATIC · S7-1500
Allen-BradleyCONTROLLOGIX · L8x
MitsubishiQ · FX SERIES
OPC-UASECURE · PUB-SUB
ModbusTCP · RTU
SAP / Tally BridgeFINANCE HAND-OFF
// compliance & finance · ships day-one
GSTR-1 / 2B / 3BAUTO-FILED
e-Invoicing · IRNGSTN · LIVE
e-Way BillAUTO · ON DISPATCH
FSSAI14-DIGIT · TRACEABLE
Excise · ENA / IMFLBONDED-W/H AWARE
ISO 27001IN-PROGRESS · Q3 '26
We'd survived three ERPs that promised the world and broke at month-end. Trustbit walked the floor with our shift in-charge and built the thing around our actual registers. First month-end after go-live closed in two days.”
Plant Head R. Phadnis // Saraswat Distillers · 240 KLPD
06 · Talk to us

Show us a register or a spreadsheet — we'll show you what an ERP could do with it.

A 45-minute walkthrough, a real demo on data that looks like yours, and a written scope with numbers you can take to the board. No deck-ware.